WtE construction information

In this section, you can find Information on the construction of WtE for 2021.

The total volume of purchased installed capacity, planned for selection in 2021, is 100.8 MW, with a breakdown of the group of settlements (Nur-Sultan-21.1 MW; Almaty-33.3 MW; Aktobe-10.9 MW; Ust-Kamenogorsk-4.5 MW; Shymkent-15.2 MW; Karaganda-15.8 MW.).

In 2021, there will be one auction for energy waste disposal with one lot for the above-mentioned group of settlements (date of the event: 15.07.2021).

*The documentation required to participate in the auction can be found here.



Auction key dates